Trans Damodar Coal Mine
DPL is engaged with generation of power from its thermal power station at Durgapur. The main fuel is coal which was primarily been sourced from subsidiaries like ECL, BCCL and MCL of Coal India Ltd through Fuel Supply Agreements (FSA). But there were difficulties receiving the agreed quantity and quality of coal for which station capacity could not be ascertained. Hence, it was felt for a captive coal mine which would resolve the scarcity of fuel as well as ascertain the optimum capacity utilisation.
Opportunity came when Ministry of Coal published the tender for auction of Trans Damodar Coal Mine in December 2014. DPL submitted the bid and ultimately won the mine through reverse bidding and executed Coal Mine Development and Production Agreement (CMDPA) with Ministry of coal on 2nd march 2015. Ministry of Coal issued Vesting Order for Trans Damodar Coal Mine on 23rd March 2015 with effect from 1st April 2015 in favour of DPL.
DPL engaged M/s Transdamodar Mining Pvt Ltd as the Mine Developer and Operator (MDO) for development of the mine, excavation of coal and supply of coal to Delivery Point on way to DPL Plant. And execute Coal Mining Services Agreement on 14.12.2018. After obtaining all the statutory permissions and clearances, coal production started w.e.f December 2020 form Trans Damodar Coal Mine.
Details of Trans Damodar Coal Mine:
# |
Features |
Details |
|||||
1. |
Location |
|
|||||
|
Coal Field |
Barjora Coal Field |
|||||
|
Latitude |
23º26’15” N & 23º27‘54” N |
|||||
|
Longitude |
87º17’20” E & 87º19‘09” E |
|||||
|
Villages |
Shalgara, Gokul Mathura, Kishoripur, Jaysinghpur, Paharpur |
|||||
|
Tehsil/ Taluka |
Barjora |
|||||
|
District |
Bankura |
|||||
|
State |
West Bengal |
|||||
2. |
Area |
|
|||||
|
Geological Block Area |
4.00 sq KM |
|||||
|
Project Area |
294.86 (quarry area) |
|||||
|
Mining Lease Area |
379.34 hectares (as per mining plan) |
|||||
|
Forest Area |
NIL |
|||||
|
Non Forest Area |
379.34 hectares |
|||||
3. |
Exploration |
|
|||||
|
Status of Exploration |
Explored |
|||||
|
Exploration Agency |
MECL |
|||||
|
Total Number of Boreholes |
34 |
|||||
|
Boreholes Meterage |
3696.75 m |
|||||
|
Borehole Density |
8.5 per square km |
|||||
4. |
Amount of Coal |
|
|||||
|
Total Geological Reserves |
61.73 MT |
|||||
|
Total Mineable Reserves |
48.40 MT |
|||||
|
Seam Wise Reserve |
Seam |
Geological (MT) |
Mineable (MT) |
|||
III Top |
- |
|
|||||
III Bot |
3.002 |
|
|||||
II Top |
0.99 |
|
|||||
II Bot |
5.67 |
|
|||||
II Combined |
39.19 |
|
|||||
I |
12.88 |
|
|||||
5. |
Coal Seams |
|
|||||
|
Dip of Seam |
4º to 6º |
|||||
|
Direction of Strike |
Major part of the sector the strike of the beds is almost north with minor swing However, in the south western part the strike of the strata is WNE-ESE to NW-SE. |
|||||
|
Coal Seams |
Coal Seam |
Variation in Thickness (Meters) |
||||
III Top |
0.46-2.97 |
||||||
III Bot |
0.40-3.88 |
||||||
II Top |
1.17-1.52 |
||||||
II Combined |
8.43-11.34 |
||||||
I |
1.20-3.32 |
||||||
|
Partings |
Average Thickness (in meters) |
Usual (meters) |
||||
Hard OB |
- |
||||||
Parting between III Top and III Bot |
4.37-15.25 |
||||||
Parting between III Bot and II Top |
- |
||||||
Parting between II Top and II Bot |
1.29 |
||||||
Parting between II Bot and II Combined |
66.53-75.00 |
||||||
Parting between II Combined and I |
24.67-33.93 |
||||||
|
Faults |
|
|||||
6. |
Grade |
Seam |
Range |
||||
III Top |
F-F |
||||||
III Bot |
C-F |
||||||
II Combined |
C-F |
||||||
I |
D-E |
||||||
7. |
Accessibility |
|
|||||
|
Nearest Rail Head Distance |
Durgapur, 5 km |
|||||
|
Road |
Durgapur Bankura State Highway |
|||||
|
Airport Distance |
Kolkata at about 180 km |
|||||
8. |
Hydrography |
|
|||||
|
Local Surface Drainage Channels |
|
|||||
|
Rivers/ Nala |
Damodar River, 3 Km from project area |
|||||
9. |
Climate |
|
|||||
|
Average Annual Rainfall |
1380 mm |
|||||
|
Temperatures (Winter) |
15º to 22º |
|||||
|
Temperatures (Summer) |
25º to 43º |
|||||
10. |
Topography |
|
|||||
|
Topo Sheet Number |
73-M/7 |
|||||
|
Nature of Surface Land |
Undulating Topography |
|||||
11. |
Other Infrastructure |
|
|||||
|
Coal Handling Plant Capacity |
Available |
|||||
|
Coal Washery Capacity |
Not Available |
|||||
|
Transport from Mine |
Road , 5000 TPD |
|||||
|
Power Supply |
Available |
|||||
Production and dispatch of coal:
Year |
Production, in Metric Ton |
Dispatch, in Metric Ton |
2020-21 |
66954.07 |
23783 |
2021-22 |
512924.00 |
533350.41 |
2022-23 |
551156.00 |
526584.65 |
2023-24 |
1000000.00 |
680000.00 |